Skip to content
Mgr. art. Ján Michalov financial intermediary
Log in Book a consultation
EN

Construction mortgage

MortgagesJán Michalov2 min read

With a construction mortgage, the bank releases the money gradually, in tranches based on the building’s current value, and at most banks only once the shell reaches one metre. Some banks finance it from the plot onwards; elsewhere you must apply for two mortgages.

Half-built house with a crane

Construction mortgage

A construction mortgage is considered one of the most complicated types. During construction, a number of problems can arise that can derail your path to a new home.

When you build a house, the bank releases the loan gradually/in tranches. A tranche is the release of part of the loan based on the current value of the property (up to 70–90%). The standard number of tranches is 6 – more are possible depending on the bank you choose.

At most banks, the basic condition for drawing the loan is to have the foundations and shell built up to 1 metre. But there are also banks that will finance construction starting from the plot, with no building work begun. The banks that can finance construction when initially only the plot itself is pledged are Tatra banka, ČSOB and UniCredit Bank. In this case, the bank approves the future value of the property based on the design documents and an expert valuation of the plot. The client receives the first tranche of the mortgage as a % of the plot’s value. Then, once the house is under construction, the bank also draws up pledge agreements for the unfinished house, and these are registered at the cadastre (land registry) together with the expert valuation and the building permit.

Besides these 3 banks, you can also apply for a construction mortgage at other banks, but you will have to apply for two mortgages in total. A construction mortgage secured on the plot, and then a construction mortgage secured on the house already under construction.

House mortgages and potential problems during construction

When you build a house, you are bound to run into unforeseen problems or complications. But do not let them put you off. The most common problems clients have faced include:

  • choosing the wrong bank / a mortgage application submitted incorrectly
  • a building permit with a short period of validity
  • a lack of your own funds / the building gaining too little value when you ask for the next tranche
  • a poorly located property – marked down for its location
  • expensive building materials – the original cost estimate keeps rising
  • the wrong order of construction steps – (large investments in the exterior, garage, access road)
  • changes during construction – not matching the design documents and the building permit – problems with the occupancy permit
  • too little money of your own.

Building a house as such is a demanding and often lengthy process. Many things need to be thought through, from the plot itself to where the building will stand, the design, the materials used and so on. Besides the mortgage itself, other “paperwork” and trips round the authorities await you. You need to obtain a building permit, utility connections, consent from the neighbouring landowners affected, and to settle the legal status of the access road.

So leave the rest of the arrangements to me. You will have enough on your plate anyway.

Read next

All articles

Call me. The first meeting costs nothing.

0905 946 769